Construction and Assembling of metallurgical plant GEOSTEEL LLC, Rustavi, Georgia, 2008-2009

- Excavation Soil 45,000 m3
- Reinforced Steel Bars 1,200 t.
- Concreting of various complicated fundaments with (B20 – B45) reinforced concrete in amount of 12,000 m3
- Volume of Installed Fabricated Steel 3,000 t
- Volume of installed equipment on technological line 1600 t.